EchoWater Project Opportunities Archive

Overview

EchoWater Opportunities Archive

Past EchoWater business opportunities and supporting documents/reports are stored here.

Post

RFP for TTF Screening System Pre-Contract with Assignment to Contractor
Revised November 23, 2016

The Sacramento Regional County Sanitation District (Regional San) will receive Proposals from Drum Screen Suppliers for the Tertiary Treatment Facility (TTF) Project Pre-Contract with Assignment to Contractor RFP.

Deadline to Submit Proposals (extended): December 6, 2016

RFP for TTF Screening System Pre-Contract with Assignment to Contractor

Addendum 1

Addendum 2

Addendum 3

Post

Channel Aeration Blower (CAB) Project RFP
Posted Aug. 17, 2016

Pre-Proposal Site Visit: August 29, 2016 at 1:30 p.m.

Deadline to Submit Questions: September 8, 2016

Deadline to Submit Proposals: September 19, 2016

Pre-Proposal Site Visit: Prospective consultants or consultant teams can attend a pre-proposal site visit on the date/time listed above. Please notify Ryan Hougham, PMO project manager, at 916-875-9031 or houghamr@sacsewer.com no later than 5 PM on August 26 with a list of attendees who will be present at the visit.

Pre-Proposal Meetings: Prospective consultants or consultant teams may request one private meeting with Regional San after the RFP is issued and prior to the proposal due date. Meetings may be scheduled on August 31 or September 1, 2016, for up to one hour. Contact Ryan Hougham, PMO project manager, at 916-875-9031 or houghamr@sacsewer.com. Regional San’s selection committee will attend the meeting. 

Questions Regarding the RFP: Proposers are encouraged to submit questions regarding the scope and requirements of the RFP. All requests for information concerning the RFP must be in writing and directed to Ryan Hougham, PMO Project Manager (houghamr@sacsewer.com) on or before 3:00 PM on September 8, 2016. If any new or substantive information is provided in response to questions, addenda will be issued and posted on Regional San’s website at www.regionalsan.com/echowater-project-opportunities.

RFP Documents

Channel Aeration Blower RFP

Addendum 1

Addendum 2

Attachments

A. Draft Channel Aeration Air Blowers Business Case Evaluation Final Alternatives and Project Timing

B. Design Contract Requirements for EchoWater Projects

C. Regional San Project CAD/BIM Standards

D. Design Guidelines

E. Design Consultant Project Management Requirements

F. Reliability Centered Design Implementation Guide

G. Design Consultant Cost Estimating Guidelines

H. Preliminary Geotechnical Information

I. BCE Guidance

J. Commissioning Plan Preparation Guide

K. Sample Labor Hour Matrix

L. District Sample Agreement

M. Existing CAA System Drawings

M1. Listing of CAA System Drawings

N. CAA Connections

Post

Return Activated Sludge (RAS) Pumping – Notice to Contractors
Posted January 13, 2016

Due date: March 17, 2016, at 2 p.m.

Pre-Bid Meeting: There will be a mandatory pre-bid conference and walk-through for prime contractors at 10:00 a.m., February 5, 2016 (unless changed by addendum) at the SRWTP Commons Room at 8521 Laguna Station Road, Elk Grove, CA, 95758. Subcontractors are not required to attend. Attendees must email Regina Hood at hoodre@sacsewer.com with attendee names prior to the meeting.

Contact: Lucy Escobar, Project Manager, at RASbids@sacsewer.com

Notice to Contractors-Return Activated Sludge (RAS) Pumping

RAS Pre-Bid Meeting Presentation

Post

Biological Nutrient Removal Project – Notice to Contractors
Posted October 28, 2015

Due date: February 11, 2016, at 2 p.m.

Pre-Bid Meeting: There will be a mandatory pre-bid conference and walk-through for prime contractors at 9:00 a.m., November 18, 2015 (unless changed by addendum) at the SRWTP Commons Room at 8521 Laguna Station Road, Elk Grove, CA, 95758. Subcontractors are not required to attend. Attendees should be prepared to walk approximately one mile during the tour. Attendees must email Regina Hood at hoodre@sacsewer.com with attendee names prior to the meeting.

Contact: Mark Hammer, Project Manager, at BNRbids@sacsewer.com

Notice to Contractors – Biological Nutrient Removal Projectamended 12/14/15

BNR Pre-Bid Meeting Presentation

Post

Nitrifying Sidestream Treatment (NST) Project – Notice to Contractors
Posted September 23, 2015

Regional San is advertising for bids for the construction of the Nitrifying Sidestream Project at the Sacramento Regional Wastewater Treatment Plant (SRWTP).

Due Date: November 13, 2015, 2:00 p.m. – EXTENDED

Mandatory pre-bid conference and walk-through: Friday, October 9, 2015,10:00 am, (unless changed by addendum) at the SRWTP Commons Room at 8521 Laguna Station Road, Elk Grove, CA, 95758. Attendees must email Regina Hood at hoodre@sacsewer.com with attendee names prior to the meeting.

Review the NTC for more details:

Notice to Contractors - Nitrifying Sidestream Treatment Project (NST) – posted 11/9/15

Pre-Bid Meeting Presentation

Post

Main Electrical Substation Expansion Project – Notice to Contractors
Posted August 26, 2015

Regional San is re-advertising for bids for the construction of the Main Electrical Substation Expansion Project at the Sacramento Regional Wastewater Treatment Plant (SRWTP). The project will expand the 12kV main electrical substation that provides power to SRWTP to feed power to all new EchoWater Projects. Major project elements include: expanding the existing 12kV electrical switchgear to include

Due Date: November 12, 2015, 2:00 p.m. – EXTENDED

Mandatory pre-bid conference and walk-through: Monday, September 14, 2015,10:00 am, (unless changed by addendum) at the SRWTP Commons Room at 8521 Laguna Station Road, Elk Grove, CA, 95758. Attendees must email Sidney Kangas at kangassi@sacsewer.com with attendee names prior to the meeting.

Review the NTC for more details:

Notice to Contractors – Main Electrical Substation Expansion Project Addendum 1 – posted 9/29/15

Main Electrical Substation Expansion Pre-Bid Meeting and Tour Presentation

Post

Notice to Contractors – Miscellaneous Site Buildings Project
Originally posted Aug. 12, 2015; revised Sept. 10, 2015

Regional San is advertising for bids for the construction of the Miscellaneous Site Buildings Project at the Sacramento Regional Wastewater Treatment Plant (SRWTP).

Note: This Notice to Contractors has been revised. The bid due date has changed. The revised NTC is posted below.

Revision: September 10, 2015

NOTICE TO CONTRACTORS — Miscellaneous Site Buildings Project (revised)

Due Date: September 24, 2015, 2:00 p.m.

Post

Request for Prequalification for General Contractor for the EchoWater Project Biological Nutrient Removal (BNR) – Contract 4208
Posted July 7, 2015

Due: August 14, 2015, by 3:00 p.m.

Request for Prequalification for General Contractor for the EchoWater Project Biological Nutrient Removal (BNR) – Contract 4208

Addendum 1 – posted 7/28/15

Addendum 2 – posted 7/28/15

Questions about the Contractor Prequalification deadline has been extended to August 7, 2015 at 3:00 p.m. All questions must be submitted in writing to Regional San’s Representative, at the following address:

Post

Request for Prequalification for Instrumentation & Control Subcontractors for the EchoWater Project
Posted June 26, 2015

Note: This is a supplementary prequalification to add to the current list of prequalified Instrumentation & Control Subcontractors.

Due: July 24, 2015, by 3 p.m.

Request for Prequalification for Instrumentation & Control Subcontractors for the EchoWater Project

Post

Request for Prequalification for Electrical Subcontractor for the EchoWater Project
Posted June 26, 2015

Note: This is a supplementary prequalification to add to the current list of prequalified Electrical Subcontractors.

Due: July 31, 2015, by 3 p.m. – EXTENDED

Request for Prequalification for Electrical Subcontractor for the EchoWater Project

Addendum 1 – posted 7/23/15

Post

Request for Equipment Supplier Prequalification, Primary Effluent Vertical Axial/Mixed Flow Pumps for Biological Nutrient Removal (BNR) Project
Posted June 22, 2015

Regional San has elected to prequalify equipment suppliers for four (4) primary effluent pumps for the Primary Effluent Pump Station, included as part of the Biological Nutrient Removal (BNR) project to be undertaken as part of the EchoWater Project.

Deadline: Prequalification Packages due by 3:00 PM on July 31, 2015

BNR Project-PEPS-Pump Supplier Prequalification

Addendum 1

Post

Disinfection Chemical Storage Project – Notice to Contractors
Posted May 13, 2015; updated May 27, 2015

Regional San is advertising for bids for the construction of the Disinfection Chemical Storage Project at the Sacramento Regional Wastewater Treatment Plant (SRWTP). The project will remove the existing gaseous chlorine and gaseous sulfur dioxide facilities and convert to a liquid sodium hypochlorite and liquid sodium bisulfite chemical storage and feed system.

Due Date: July 9, 2015, 2:00 pm – EXTENDED

Mandatory pre-bid conference and walk-through: Thursday, June 4, 2015, 9:00 am (unless changed by addendum) at SRWTP Commons Room at 8521 Laguna Station Road, Elk Grove, CA, 95758.  Attendees must email Sidney Kangas at kangassi@sacsewer.com with attendee names prior to the meeting.

Review the NTC for more details:

Notice to Contractors – Disinfection Chemical Storage Project – amended 6/29/15

Pre-Bid Meeting Presentation – Disinfection Chemical Storage Project – posted 6/4/15

Pre-Bid Meeting Sign-In Sheet – Disinfection Chemical Storage Project – posted 6/4/15

Post

Construction Management Services for the EchoWater Project – Procurement 2 Request for Proposal (RFP)

The Sacramento Regional County Sanitation District (Regional San) will receive proposals for Construction Management Services for a portion of the EchoWater Project (Program) at the Sacramento Regional Wastewater Treatment Plant (SRWTP).

Deadlines

Deadline to Submit Questions: May 15, 2015

Deadline to Submit Proposals: May 29, 2015, by 3:00 p.m.

Documents

Construction Management Services for EchoWater Project - Procurement 2 RFP

Addendum 1 – Construction Management Services for EchoWater Project - Procurement 2 RFP – posted 5/4/15

Post

Biological Nutrient Removal (BNR) Vertical Mixer System Pre-Contract with Assignment to Installation Contractor Request for Proposal (RFP)

The Sacramento Regional County Sanitation District (Regional San) will receive Proposals from Vertical Mixer System suppliers for the Biological Nutrient Removal (BNR) Pre-Contract with Assignment to Installation Contractor Request for Proposal (RFP).

Deadlines

Deadline to Submit Questions: April 13, 2015

Deadline to Submit Proposals: May 22, 2015 – EXTENDED

Documents

Release Notice – Biological Nutrient Removal (BNR) Pre-Contract with Assignment to Installation Contractor RFP

Biological Nutrient Removal (BNR) Pre-Contract with Assignment to Installation Contractor RFP

Addendum 1 – BNR Pre-Contract with Assignment to Installation Contractor RFP – posted 4/14/15

Addendum 2 – BNR Pre-Contract with Assignment to Installation Contractor RFP – posted 4/22/15

Addendum 3 – BNR Pre-Contract with Assignment to Installation Contractor RFP – posted 5/12/15

Addendum 4 – BNR Pre-Contract with Assignment to Installation Contractor RFP – posted 5/19/15

Post

Return Activated Sludge (RAS) Pumping Pre-Contract with Assignment to Contractor RFP

The Sacramento Regional County Sanitation District (Regional San) will receive Proposals from a Vertical Turbine Solids-Handling Pump Supplier for the RAS Pumping Pre-Contract with Assignment to Contractor RFP.

Deadlines

Deadline to Submit Questions: April 9, 2015

Deadline to Submit Proposals: April 23, 2015

Documents

Release Notice: RAS Pumping Pre-Contract with Assignment to Contractor RFP

RAS Pumping Pre-Contract with Assignment to Contractor RFP

Addendum 1 – RAS Pumping Pre-Contract with Assignment to Contractor RFP – posted 4/15/15

Commands