EchoWater Project Opportunities Archive

Overview

EchoWater Opportunities Archive

Past EchoWater business opportunities and supporting documents/reports are stored here.

Post

RFP #9036 – Safety Professional Services
Posted June 21, 2018

The Sacramento Regional County Sanitation District (Regional San) is seeking qualified and experienced firms to provide occupation health and safety services and assist Regional San Staff with the implementation and coordination of their current health and safety programs, including an Owner Controlled Insurance Program (OCIP) Safety Program for the EchoWater Project.

Due Date: July 13, 2018 by 2:00 p.m.

Questions: All questions regarding this RFP must be sent by email to Sidney Kangas at kangassi@sacsewer.com

RFP #9036

A. Sample Agreement

B. Regional San Safety Program

C. Conflict of Interest and Non-Collusion Affidavit

Post

Notice to Contractors – Bradshaw Equalization Structure (BES) Pipeline – Contract #6001
Posted March 23, 2018

Due Date: April 25, 2018, by 1 p.m. [EXTENDED]

Mandatory Pre-Bid Meeting: April 13, 2018, at 2:00 p.m. [UPDATED]
There will be a mandatory pre-bid conference and walk-through for prime contractors at 2:00 p.m., April 6, 2018 (unless changed by addendum), at the SRWTP Administrative Building, Commons Room at 8521 Laguna Station Road, Elk Grove, CA, 95758. Subcontractors are not required to attend. Attendees should be prepared to walk approximately one mile during the tour. Attendees must email Amanda Morrow at BES@sacsewer.com with attendee names prior to the meeting.

Questions Due Date: April 11, 2018

Notice to Contractors – Bradshaw Equalization Structure (BES) Pipeline – Contract #6001

Addendum #1

Post

Notice to Contractors – Channel Aeration Blower Design (CAB) – Contract 4385
Posted March 15, 2018

Mandatory Pre-Bid Meeting: March 27, 2018, at 9:00 a.m.
There will be a mandatory pre-bid conference and walk-through for prime contractors at 9:00 am, March 27, 2018 (unless changed by addendum) at the SRWTP Administrative Building, Commons Room at 8521 Laguna Station Road, Elk Grove, CA, 95758. Subcontractors are not required to attend. Attendees should be prepared to walk approximately one mile during the tour. Attendees must email Maggie Kido at cabbids@sacsewer.com with attendee names prior to the meeting.

Questions Due Date: April 23, 2018

Due Date: May 2, 2018, at 1:00 p.m.

Notice to Contractors - Channel Aeration Blower Design (CAB) - Contract 4385

Pre-Bid Meeting Presentation

CAB Tunnel Rendering

Post

Channel Aeration Blower Design Submittal
Posted February 16, 2018

Regional San has elected to post the design submittal for the Channel Aeration Blower (CAB) project to be undertaken as part of the EchoWater project. Black and Veatch is the lead designer of the CAB project and will be responsible for the drawings and review of the construction associated with the Project. The bid documents will be distributed as one complete set of drawings and specifications that covers all elements of the project. As of the date for this document, the design for the CAB project is between design submittal #3 and bid set.  All references to drawings and specifications contained herein relate to the Design submittal #3 that can be accessed at the following Dropbox address: https://www.dropbox.com/sh/vm532q73ynrfogo/AABr-qG6nJzwuOdlmAENT5Dxa?dl=0

Bid Advertisement: March 15, 2018

Questions about the CAB project must be submitted electronically to Maggie Kido, at the following email address cabbids@sacsewer.com

Post

Request for Equipment Supplier Prequalification – Channel Aeration High Speed Gearless Turbo Blowers
Posted January 25, 2018

Regional San has elected to prequalify equipment suppliers for seven (7) high speed gearless turbo blowers included as part of the Channel Aeration Blower Replacement (CAB) project to be undertaken as part of the EchoWater Project.

Due Date: February 13, 2018, by 3 p.m. (extended)

Questions Due Date: February 2, 2018, by 3 p.m. Questions about the Equipment Supplier Prequalification must be submitted electronically to Maggie Kido, at the following email address: cabbids@sacsewer.com

Blower Supplier Prequalification

Addendum #1

Addendum #2

Post

Request for Prequalification for Equipment Supplier Prequalification – Filter Influent Vertical Axial/Mixed Flow Pumps
Posted November 28, 2017

Regional San has elected to prequalify equipment suppliers for four (4) filter influent pumps for the Filter Influent Pumping Station, included as part of the Tertiary Treatment Facilities (TTF) project to be undertaken as part of the EchoWater Project.

Due Date: December 22, 2017, by 3 p.m.

Questions Due Date: December 11, 2017, 3 p.m. Questions about the Equipment Supplier Prequalification must be submitted electronically to Graham Calciano, at the following email address: calcianog@sacsewer.com.

TTF FIPS Prequal RFQ

Addendum #1

Click here for Appendix C – Project TTF – Design 4283 FIPS Curves

Post

Request for Prequalification for Instrumentation & Control Subcontractors for Tertiary Treatment Facilities (TTF) – Contract 4283
Posted November 13, 2017

Regional San has elected to prequalify Instrumentation & Control Subcontractors for the Tertiary Treatment Facilities (TTF) project to be undertaken as part of the EchoWater Project.

Due Date: December 6, 2017, by 3 p.m.

Questions about the Electrical Subcontractor Prequalification must be submitted electronically to Ron Perkins, at the following email address: ttf@sacsewer.com.

IC Subcontractor Prequalification—TTF

Post

Request for Prequalification for Electrical Subcontractors for Tertiary Treatment Facilities (TTF) – Contract 4283
Posted November 13, 2017

Regional San has elected to prequalify Electrical Subcontractors for the Tertiary Treatment Facilities (TTF) project to be undertaken as part of the EchoWater Project.

Due Date: December 6, 2017, by 3 p.m.

Questions about the Electrical Subcontractor Prequalification must be submitted electronically to Ron Perkins, at the following email address: ttf@sacsewer.com.

Electrical Subcontractor Prequalification—TTF

Post

Request for Statements of Prequalification – Effluent Valve Replacement (EVR) Project
Posted September 5, 2017

Due date: September 22, 2017, by 3 p.m.

Mandatory Pre-SOPQ Submission Meetings: September 13, 2017, 9 a.m., or September 18, 2017, 9 a.m. (see SOPQ document for details)

Questions: Must be submitted in writing by U.S. Mail or E-mail (with E-mail delivery receipt request) to Regional San’s Representative, at the following address:
Attn: Mr. Dane Coyle
SRWTP Administration Building
8521 Laguna Station Road
Elk Grove, CA 95758
Email: evr@sacsewer.com

Request for Statements of Prequalification – Effluent Valve Replacement (EVR) Project

Addendum 1

Addendum 2

Addendum 3

Pre-SOPQ Meeting Sign-In Sheet

Pre-SOPQ Presentation

Post

Notice to Contractors – Statements of Pre-Qualifications for Effluent Valve Replacement Project
Posted August 31, 2017

Due Date: September 22, 2017, by 3:00 p.m.

Mandatory Pre-Meeting: September 13, 2017, at 9:00 a.m. See details in Notice to Contractors.

Questions in Writing:
Attn: Mr. Dane Coyle
SRWTP Administration Building
8521 Laguna Station Road
Elk Grove, CA 95758
Email: evr@sacsewer.com

Post

Request for Prequalification for Equipment Supplier Prequalification – Filter Influent Vertical Axial/Mixed Flow Pumps
Posted August 15, 2017

Regional San has elected to prequalify equipment suppliers for four (4) filter influent pumps for the Filter Influent Pumping Station, included as part of the Tertiary Treatment Facilities (TTF) project to be undertaken as part of the EchoWater Project.

Revised Due Date: October 13, 2017, by 3 p.m.

Questions about the Equipment Supplier Prequalification must be submitted electronically to Graham Calciano, at the following email address: calcianog@sacsewer.com by September 8, 2017, 3 p.m.

Pump Supplier Prequalification

Addendum 1

Post

(REVISED) Request for Prequalification for General Contractor for EchoWater Project Tertiary Treatment Facilities (TTF)—Contract 4283
Posted August 23, 2017

Revised Due Date: September 22, 2017, by 3 p.m.

Questions about the Contractor Prequalification must be submitted in writing to Regional San’s Representative, at the following address:
Attn: Ron Perkins, PMO CM Lead
EchoWater Project
SRWTP Administration Building
8521 Laguna Station Road
Elk Grove, CA 95758
TTF@sacsewer.com

Post

Contractor Outreach
Posted May 3, 2017

Regional San held a non-mandatory, informational Contractor Outreach meeting on May 23, 2017, to provide an overview of the current program, and status, schedule, and planned elements of the EchoWater Project, and to address questions relating to the upcoming pre-qualification packages for the Tertiary Treatment Facility Project and Electrical contractors.

Contractor Outreach Meeting Notice

Contractor Outreach Meeting Presentation

VIDEO: EchoWater Overview

Commands