General Opportunities Archive

General Opportunities Archive

Overview

Past general business opportunities and supporting documents/reports are stored here.

Post

RFB #8224 MS Tank No. 1 – Steel Shell Replacement Project

Posted March 16, 2017

Due Date: April 12, 2017, by 3 p.m.

Questions Due: April 5, 2017

Pre-Bid Meeting: A mandatory pre-bid meeting will be held on March 29, 2017, at 11:00AM at the Sacramento Regional Wastewater Treatment Plant (8521 Laguna Station Rd, Elk Grove, CA 95758). The purpose of the meeting is to review and clarify project requirements, conduct site inspection, and to respond to questions from the bidders. Pre-Bid Meeting attendees must e-mail Aaron Bihlman at bihlmana@sacsewer.com with attendee names to RSVP prior to the meeting.

ISSUING OFFICER
The issuing officer and mailing address to send bids, questions, and all other correspondence concerning this RFB is:
Tamblynn Stewart
Senior Contract Service Officer
(916) 875-9014
stewartt@sacsewer.com

PROJECT CONTACT
Aaron Bihlman
Sacramento Regional Wastewater Treatment Plant (SRWTP)
Sacramento Regional County Sanitation District (Regional San)
(916) 875-9214
bihlmana@sacsewer.com

RFB #8224 MS Tank No. 1 – Steel Shell Replacement Project

Drawings

Addendum #1

Addendum #2 – Attachment 1

Addendum #2 – Attachment 2

Addendum #3

Post

RFB #8225 WRH & WRL Pipeline Project

Posted January 10, 2017

Mandatory Pre-Bid Meeting: January 19, 2017, 9:00 A.M., Sacramento Regional Wastewater Treatment Plant, 8521 Laguna Station Road, Elk Grove, CA 95758. Email Thomas Ullensvang at ullensvangt@sacsewer.com with names of attendees.

Question Due Date: January 26, 2017

Bid Due Date: February 2, 2017, by 3:00 p.m.

Issuing Officer:
Tamblynn Stewart
(916) 875-9014

Addendum #1

Addendum #2

RFB #8225 WRH and WRL Pipeline Project

RFB #8225 Specs Volume 1 of 2

RFB #8225 Drawings Volume 2 of 2

Post

RFP #8227 – On-Call Street Sweeping Services

Posted December 19, 2016

Due Date: January 19, 2017, by 3 p.m.

Question Deadline: January 12, 2017

Contacts:
Senior Contract Service Officer:
Tamblynn Stewart
Sacramento Regional County Sanitation District
8521 Laguna Station Road
Elk Grove, CA 95758
(916) 875-9014
stewartt@sacsewer.com

Regional San:
Scott Jones P.E. Associate Civil Engineer
Sacramento Regional County Sanitation District
8521 Laguna Station Road
Elk Grove, CA 95758
(916) 876-6250
jonessc@sacsewer.com

Post

Notice to Contractors – South River Pump Station Flood Protection Project

Posted December 19, 2016

Due Date: January 26, 2017, by 2:00 pm

Mandatory Pre-Bid: A mandatory pre-bid conference and walk-through will be held for the purpose of reviewing and answering questions regarding this project.  Attendees must e-mail Scott Mueller (muellers@sacsewer.com) with attendee names prior to the meeting. This information is required to provide access at the South River Pump Station security gate.  Representatives of the District and the Design Consultant will be present for questions.

January 4, 2017 at 9:00 am
South River Pump Station
30030 South River Road
Clarksburg, CA 95612

Contact: Scott Mueller, Project Manager, (916) 876-6399, muellers@sacsewer.com

Post

Advertisement for Bids—Lined Dedicated Land Disposal Unit 5 (LDLD 5), Contract #4341

Posted December 15, 2016

Mandatory Pre-Bid Conference: January 4, 2017, 9:00 a.m., Sacramento Regional Wastewater Treatment Plant, 8521 Laguna Station Road, Elk Grove, CA 95758
Email Ami Patrick at LDLD5Bids@saccounty.net at least 24 hours prior with attendee names.

Bid Due Date: January 30, 2017, by 2:00 p.m.

Contact:
Ami Patrick
LDLD5Bids@saccounty.net

NOI for Contract #4341

Addendum #1

Addendum #2

Advertisement for Bids—Lined Dedicated Land Disposal Unit 5, Contract #4341

Bid Documentation Reference Information

LDLD 5 Preliminary Construction Schedule 2016-12-19

LDLD 5 Pre-bid meeting slides 2016-01-04

Post

RFB #8232 – South River Pump Station Tree Removal Project

Posted November 3, 2016

Due Date: December 1, 2016, by 3:00 P.M.

Question Due Date: November 22, 2016

DIR Registration Due: November 29, 2016; bids from Contractors not registered on the Department of Industrial Relations website by this date will not be opened.

ISSUING OFFICER: The issuing officer and mailing address to send Bids, questions, and all other correspondence concerning this RFB is:
Rodger A. Kuchik
Contract Service Officer II
Sacramento Regional County Sanitation District
8521 Laguna Station Road
Elk Grove, CA 95758
(916) 875-9015
kuchikr@sacsewer.com

PROJECT CONTACT:
Scott Mueller (Main Project Contact)
Sacramento Regional Wastewater Treatment Plant (SRWTP)
Sacramento Regional County Sanitation District (SRCSD)
Telephone: (916) 876-6399
muellers@sacsewer.com

RFB #8232 – South River Pump Station Tree Removal Project

Drawings

Post

RFB#8218 Digesters and GMS Electrical Upgrades, Specification and Drawing

Posted October 31, 2016

Due date: November 29, 2016, by 3 p.m.

MANDATORY Pre-Bid Meeting: November 15, 2016, at 9:00AM at the Sacramento Regional Wastewater Treatment Plant (8521 Laguna Station Rd, Elk Grove, CA 95758). The purpose of the meeting is to review and clarify project requirements, conduct site inspection, and to respond to questions from the bidders. Pre-Bid Meeting attendees must e-mail Ronald Kwok at kwokr@sacsewer.com with attendee names to RSVP prior to the meeting. This information is required to provide access at the Treatment Plant’s security gate.

ISSUING OFFICER
The issuing officer and mailing address to send Bids, questions, and all other correspondence concerning this RFB is:
Tamblynn Stewart
Senior Contract Services Officer
Sacramento Regional County Sanitation District
(916) 875-9014
stewartt@sacsewer.com

PROJECT CONTACT
The project contact for this RFB is:
Ronald Kwok, PE, MIET
Sacramento Regional Wastewater Treatment Plant (SRWTP)
Sacramento Regional County Sanitation District (SRCSD)
kwokr@sacsewer.com

RFB#8218 Digesters and GMS Electrical Upgrades, Specification and Drawing

Specifications

Drawings

Post

RFP for Safety Product and Equipment

Posted October 18, 2016

Due date: November 8, 2016, by 3:00p.m.

Questions due: October 25, 2016

Issuing Officer:
Tamblynn Stewart
Sacramento Regional County Sanitation District
8521 Laguna Station Road
Elk Grove, CA 95758
(916) 875-9014
stewartt@sacsewer.com

Regional San Technical Contact:
Deborah Celestre
Senior Safety Specialist
Sacramento Regional County Sanitation District
(916) 875-9154
celestred@sacsewer.com

Post

RFP for NFPA 70E Arc Flash Analysis and Electrical Safety Program Development

Posted September 20, 2016

Due Date: October 14, 2016 by 3:00 p.m. PST

Mandatory Pre-Proposal Meeting: A mandatory pre-proposal meeting will be held at SRWTP located at 8521 Laguna Station Road, Elk Grove, CA 95758, on October 5, 2016, at 9:00 a.m. The purpose of the meeting is to review and clarify project requirements, and to respond to questions from the proposers. Pre-proposal attendees must e-mail Ronald Baptista at baptistar@sacsewer.com with attendee names to RSVP no later than 1 workday prior to the meeting. This information is required to be granted access at the SRWTP security gate. There will be a limit of two (2) representatives from each company who may attend the meeting. Upon arrival at SRWTP and passage through the security gate, visitors are to proceed to the Administration Building, and be seated in the lobby until a Regional San representative escorts the group to a conference room.

Questions Due Date: October 10, 2016. All questions regarding this RFP should be directed to Ronald Baptista, Associate Electrical Engineer, at 916-876-6009, or baptistar@sacsewer.com

RFP for NFPA 70E Arc Flash Analysis and Electrical Safety Program Development

Addendum 1

Addendum 2

Pre-Proposal Meeting Attendees

Post

RFB for Electrical Improvement Project

Posted August 26, 2016

BID DATE: September 22, 2016, 3 p.m.

MANDATORY PRE-BID MEETING: September 7, 2016, 9 a.m., at the Sacramento Regional Wastewater Treatment (8521 Laguna Station Rd, Elk Grove, CA 95758). Attendees must e-mail Wenjun Ouyang at ouyangw@sacsewer.com with attendee names prior to the meeting.

CONTACT:
Rodger A. Kuchik
kuchikr@sacsewer.com
(916) 875-9015

RFB 8220 SSB 1 Electrical Improvement Project

Specifications

Drawings

Post

RFP for Architectural Services for Sims Ranch and Nicolaus Dairy Repurposing Project

Posted June 27, 2016

Consultant will provide architectural services for stabilizing and
rehabilitating the historic features of Sims Ranch and Nicolaus Dairy in
accordance with the Secretary of the Interior’s Standards for Historic
Properties.

DUE DATE (EXTENDED): August 12, 2016, by 3:00 p.m.

QUESTIONS DUE: July 27, 2016, by 12:00 p.m. All questions regarding this RFP should be directed to Jason Lofton, Senior Civil Engineer, at (916) 876-6008, or loftonj@sacsewer.com.

RFP for Architectural Services for Sims Ranch/Nicolaus Dairy

Addendum 1

Addendum 2

Response to Questions

Addendum 3

Post

Notice to Contractors – Sacramento Regional County Sanitation District / Sacramento Power Authority / City of Sacramento Water Recycling Pipeline—Phase 1B

Posted May 16, 2016

BID DATE: June 23, 2016

MANDATORY PRE-BID CONFERENCE: May 23, 2016, 2 p.m., at the Sacramento Regional Wastewater Treatment Plant Commons Room (8521 Laguna Station Rd, Elk Grove, CA 95758). Attendees must e-mail Cary Mutschler at Mutschlerc@sacsewer.com with attendee names prior to the meeting.

CONTACT:
Gayleen Darting, PE
Regional San
hartg@sacsewer.com
(916) 875-6425

Sacramento County Construction Opportunities

All Project Documents

Notice to Contractors - Water Recycling Pipeline — Phase 1B

Post

RFP for 12.5% Trade Strength Sodium Hypochlorite

Posted May 12, 2016

Pre-Proposal Meeting: A mandatory Pre-Proposal Meeting will be held on June 2, 2016, from 10:00 a.m. PST at the Sacramento Regional County Sanitation District, 8521 Laguna Station Road, Elk Grove, CA 95758. Attendance is Mandatory. Proposals will not be accepted unless at least one representative from the Proposer’s company attends in person. Pre-Proposal Meeting attendees must e-mail Tamblynn Stewart at stewartt@sacsewer.com with attendee names to RSVP prior to the meeting. This information is required to provide access at the Treatment Plant’s security gate.

SUBMISSION DEADLINE: June 16, 2016, by 3 p.m.

RFP for 12.5% Trade Strength Sodium Hypochlorite

Addendum #1

Attachment #1 - Key Action Dates

Attachment #2 - Specifications, Intended Use, and Special Conditions

Attachment #3 - Cost Response Page

Addendum #2

Addendum #3

Attachment #4

Attachment #5

Addendum #4

Addendum #5

Addendum #6

Post

RFB for SSB Battery I DS Feed Valve Replacement Project

Posted April 26, 2016

Detailed bid request document can be obtained by contacting Tamblynn Stewart at (916) 875-9014 or stewartt@sacsewer.com.

Pre-Bid Meeting: A mandatory pre-bid meeting will be held on May 12, 2016 at 9:00AM at the Sacramento Regional Wastewater Treatment Plant (8521 Laguna Station Rd, Elk Grove, CA 95758). The purpose of the meeting is to review and clarify project requirements, conduct site inspection, and to respond to questions from the bidders. Pre-Bid Meeting attendees must e-mail Gerardo Aguirre at aguirreg@sacsewer.com with attendee names to RSVP prior to the meeting. This information is required to provide access at the Treatment Plant’s security gate.

SUBMISSION DEADLINE: May 26, 2016, by 3 p.m.

RFB for SSB Battery I DS Feed Valve Replacement Project

Specifications

Drawings

Addendum #1

Questions and Answers

KOR Flowcentric Plug Valve

Log in

Commands