Project Photos

Photo Gallery
Bulldozer at work at a pilot compaction test area on an intermediate levee for the Flow Equalization Project (July 2015)Excavation of a storage basin for the Flow Equalization Project (July 2015)Placing concrete curb and gutter for roadways and intersection as part of Site Preparation work (July 2015)Erecting the truss for the new Bufferlands building (July 2015)Excavation continues for the Flow Equalization storage basins (July 2015)Drilling of the construction water well (July 2015)Asphalt laid down for new water well (July 2015)Installing new security fence posts (July 2015)Duct bank excavation for the Fiber Optic Replacement Project (July 2015)Concrete encasement of new duct bank (July 2015)Pouring concrete for the duct bank encasement (July 2015)Asphalt grindings from a previously demolished area are reused along new fenceline (July 2015)Underground electrical work (July 2015)Scraper and blade performing rough grading (July 2015)Erecting the new Bufferlands staff building (September 2015)Bufferlands building construction (September 2015)Excavator beginning new cut below first cut of BNR mass excavation (September 2015)Excavator compacting drain rock at toe of northern jurisdictional levee (September 2015)Excavator and sheepsfoot backfilling and compacting underdrain collector trench (September 2015)Fusion splicing and testing of fiber optic cable (September 2015)Stringing overhead wiring along new power poles (September 2015)Concrete placed for transformer and switchboard pads for BNR project (September 2015)Placing concrete on foundation padsof inlet structures (September 2015)Outlet structure for drain (September 2015)The new Bufferlands building (November 2015)Underdrain Pump Station manhole for Flow EQ Project (November 2015)Sand installation on basin floor subgrade for Flow EQ Project (November 2015)Shotcrete placing and finishing in corner of basin for Flow EQ Project (November 2015)Rebar work (foreground) and shotcrete placement (background) for Flow EQ Project (November 2015)Trench for 12kV ductbank (November 2015)Microwave dish installation on tower at NCA field office (November 2015)Completed Bufferlands BuildingCompleted Bufferlands BuildingCompleted Bufferlands BuildingNitrifiying Sidestream Treatment ProjectAugust 2016August 2016August 2016August 2016August 2016August 2016August 2016August 2016August 2016August 2016August 2016August 2016August 2016August 2016August 2016August 2016August 2016Dec. 2016

Referring Pages

Log in