Engineering Services for Cathodic Protection Rehabilitation Project Phase II

Request for Proposal

Post

Sacramento Regional County Sanitation District (Regional San) completed an initial evaluation of a limited number of cathodic protection systems at the Sacramento Regional Wastewater Treatment Plant (SRWTP) and interceptor systems. The evaluation was considered to be the first step in the development of an overall corrosion control strategy for Regional San.

Phase II is a continuation of the effort to evaluate the remaining systems that have not been tested.

Referring Pages

Log in