Post

Request for Prequalification for Roller Compacted Concrete Subcontractor for Flow Equalization (FEQ) Project (REVISED)
Originally posted August 20, 2014

Note: This Request for Prequalification has been revised twice. Only the revised version is posted below.

First Revision: September 17, 2014

Second Revision: September 24, 2014

Request for Prequalification for Roller Compacted Concrete Subcontractor for Flow Equalization (FEQ) Project (2nd revision) – (posted 9/24/14)

Questions & Responses for Request for Prequalification for Roller Compacted Concrete Subcontractor for Flow Equalization (FEQ) – (posted 9/17/14)

Addendum No. 1 to Requests for Pre-Qualification for EchoWater Project - (posted 9/23/14)

Addendum No. 2 to Requests for Prequalification for EchoWater Project -(posted 10/2/14)