Post

Request for Statements of Prequalification – Effluent Valve Replacement (EVR) Project
Posted September 5, 2017

Due date: September 22, 2017, by 3 p.m.

Mandatory Pre-SOPQ Submission Meetings: September 13, 2017, 9 a.m., or September 18, 2017, 9 a.m. (see SOPQ document for details)

Questions: Must be submitted in writing by U.S. Mail or E-mail (with E-mail delivery receipt request) to Regional San’s Representative, at the following address:
Attn: Mr. Dane Coyle
SRWTP Administration Building
8521 Laguna Station Road
Elk Grove, CA 95758
Email: evr@sacsewer.com

Request for Statements of Prequalification – Effluent Valve Replacement (EVR) Project

Addendum 1

Addendum 2

Addendum 3

Pre-SOPQ Meeting Sign-In Sheet

Pre-SOPQ Presentation

Commands